Loading Events

« All Events

  • This event has passed.

March 7, 2018 @ 5:00 pm - 8:00 pm

Notice: Liberty Village Gas Pipeline Project

Overview

Enbridge Gas Distribution Inc. (“Enbridge”) is proposing to construct approximately 1.1 km of natural gas pipeline within Liberty Village. The Project will serve to supply gas to additional development, and reinforce the existing gas infrastructure to support future growth in the community.

A Preliminary Preferred Route (PPR) for the proposed natural gas pipeline has been identified. The PPR includes installation of 900m of 8-inch Intermediate Pressure (IP)steel pipe beginning at King St. W and Jefferson Ave. It heads east along King St. before being directed south onto Atlantic Ave. where it continues east along Snooker St. It then turns onto Hanna Ave. and continues south toward East Liberty St. Finally, it continues east along East Liberty St. and connects with an existing gas main at Pirandello St. The PPR also includes a second section of 6-inch Intermediate Pressure plastic pipe.

An alternate route is also being considered as part of the study. The alternate route includes 870m of 8-inch pipe, beginning at King St. W and Jefferson Ave. It heads east along King St. before being directed south onto Atlantic Ave., continuing east along Snooker St., through the Metro grocery plaza, and along the lane way connecting to East Liberty St. Finally, it continues east along East Liberty St. and connects with an existing gas main at Pirandello St.

The proposed natural gas pipeline will be located mainly within the municipal rights-of-way (ROW).

 

For more information visit: http://bit.ly/2EHGeXf

 

PUBLIC OPEN HOUSE

Location: Liberty Grace Church (25 Liberty Street)

Date: Wednesday, March 7th

Time: 5pm-8pm

Details

Date:
March 7, 2018
Time:
5:00 pm - 8:00 pm
Event Category:
Event Tags:
,

Venue

Liberty Grace Church
25 Liberty Street
Toronto,
+ Google Map